The High-Velocity Edge: How Market Leaders Leverage Operational Excellence to Beat the Competition by Steven Spear
Author:Steven Spear [Spear, Steven]
Language: eng
Format: epub, pdf
Tags: Business & Economics, Training, Management
ISBN: 9780071741408
Google: UwunoP9tKyQC
Publisher: McGraw Hill Professional
Published: 2010-05-06T23:00:00+00:00
level of customer
design
before
design
after
demand
vs.
improvement
improvement
productive
capacity
2. Objectives of
improvement
activities:
productivity/total
cycle
time
3. Design guideline:
7. Comparison of expected 8. Newly secured
increase flexibility of
and actual results
technology and other
line to fluctuations in
major
changes
volume
9. Plans for the future +
4. Summary of
proposed
schedule
results:
capacity/
utilization
System promotion expert who, in his role as coach, was there to ensure that this system-level problem solving also developed leaderships capabilities) identified three symptoms that diminished performance: inability to respond to fluctuations in volume, volatility in cycle times, and inability to keep the production pace tuned to the rate of demand.
• Each symptom corresponds to some aspect of the ideal discussed in the start of this chapter. Inability to respond to fluctuations corresponds to inability to respond on demand and immediately. The lack of a pacing mechanism also compromised the system’s ability to produce on demand. Volatility caused workers and machines to block and starve each other, a source of waste.
A
210
C a p a b i l i t y 2 : P r o b l e m S o l v i n g a n d I m p r o v e m e n t
• For each symptom, the process redesigners identified at least one process feature as the root cause. For example, the diagram attributes the system’s inflexibility to each line’s size and specialization (a rise in the demand for small mattresses could not be absorbed by one of the other two lines).
This diagram states the group’s sense of cause and effect.
• Figure 7-3 shows where on the shop floor the root-cause feature is observable.
Figure 7-3 Section 5 of Aisin document (before-condition diagram) 1 Setting the line according to size
Cannot respond to
2 Spring maker and quilting are bottlenecks
changes in volume
3 Cannot assign more than 8 people to a line
Work process becomes uneven
4 Difficult to bring large pieces to line
Cannot determine pace
5 No pace maker
of work process
Quilting
Production
2
4
sequence
Springs
2
3
1
mediate
5
Large
processes
Inter
Packing Stitching
Back
office
Springs
Small
Stitching
Packing Stitching
Completed products
Springs
Medium
Packing Stitching
A
211
T h e H i g h - v e l o c i t y E d g e Figure 7-4 focuses on section 6 of Aisin’s problem-solving summary. Again, several points are worth noting:
• For each root cause in the before-condition diagram, there is a particular change (countermeasure) in the design and operation of an activity (items 2, 3, and 4), connection (items 4 and 5), or pathway (items 1 and 2).
• Each of the countermeasures is credited with relieving a specific symptom that was identified in the before-condition diagram.
• The way each countermeasure was enacted is explained.
Flexibility was achieved by altering the spring-forming process and separating spring-forming from assembly with a buffer, which prevented volatility in one activity from blocking or starving the other. Further flexibility was achieved by dividing work processes so that people could be added and subtracted easily.
In effect, this figure can be thought of in the following fashion:
We redesigned the production system by conduct-
ing the following experiment. When we studied the
system, we found three reasons to be disappointed
with its performance. We traced these three disap-
pointments to five root causes. Therefore, to
improve the system’s performance, we addressed
each of these five root causes:
• The countermeasure for cause 1 is redesign-
ing spring-forming.
Download
The High-Velocity Edge: How Market Leaders Leverage Operational Excellence to Beat the Competition by Steven Spear.pdf
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.
Agile | Lean |
Quality Control | Six Sigma |
Total Quality Management |
Hit Refresh by Satya Nadella(8682)
The Compound Effect by Darren Hardy(8242)
Change Your Questions, Change Your Life by Marilee Adams(7152)
Nudge - Improving Decisions about Health, Wealth, and Happiness by Thaler Sunstein(7037)
The Black Swan by Nassim Nicholas Taleb(6576)
Deep Work by Cal Newport(6297)
Daring Greatly by Brene Brown(6068)
Rich Dad Poor Dad by Robert T. Kiyosaki(5892)
Principles: Life and Work by Ray Dalio(5735)
Man-made Catastrophes and Risk Information Concealment by Dmitry Chernov & Didier Sornette(5392)
Digital Minimalism by Cal Newport;(5163)
Big Magic: Creative Living Beyond Fear by Elizabeth Gilbert(5161)
The Myth of the Strong Leader by Archie Brown(5073)
The Slight Edge by Jeff Olson(5038)
Discipline Equals Freedom by Jocko Willink(4964)
Playing to Win_ How Strategy Really Works by A.G. Lafley & Roger L. Martin(4868)
The Motivation Myth by Jeff Haden(4832)
Stone's Rules by Roger Stone(4684)
The Laws of Human Nature by Robert Greene(4509)
